PRO-PLAN
Optimal Production Rates
With no constraints, the model will calculate production rates to achieve and maintain the levels in the pulp silos and liquor storages that will best cope with unplanned shuts upstream or downstream of each storage.
This is based on the probability of plant downtime upstream and downstream of each storage.